π Tender Overview
Scope : To Build a 350 MW Hybrid Power Plant in Eastern city of Zajecar, Serbia
Belgrade-based Vida Power, a unit of renewable energy developer CWP Europe, plans to build a hybrid power plant in Serbia's eastern city of Zajecar with a total capacity of 350 MW.
The hybrid power plant will comprise solar fields and wind generators, according to a detailed plan.
The project also includes the construction of a substation, a distribution switchgear, and an energy storage system. The development will cover 3,870 ha of land.