π Tender Overview
Scope :
Hunter Street Station is a new metro station being developed as part of the Sydney Metro West project in Australia.
Hunter Street Station is one of the underground metro stations being built as part of the Sydney Metro West project, which is one of the largest public transportation projects in Australia.
The station is one of nine new stations being developed as part of the metro, along with Westmead, Parramatta, North Strathfield, Burwood North, Five Dock, Sydney Olympic Park, The Bays and Pyrmont stations.
The Hunter Street Station will serve as a transport hub providing connections to other Sydney Metro lines, as well as other forms of transportation. It will be delivered as an integrated station development comprising above-station developments under a development partner model by the New South Wales (NSW) government.
Hunter Street Station location
Hunter Street Station will be located on the corner of Hunter and George Streets and Bligh and OβConnell Streets in the northern part of Sydneyβs central business district (CBD).
Hunter Street Station design and development details
The metro station will comprise two sites, east and west, which will be connected by a single-span cavern (tunnel) with a single central platform. It will feature a main western entrance opening to George Street and an eastern entrance facing OβConnell Street that will connect to Richard Johnson Square.
Subterranean walkways will be constructed from the station to Martin Place, Wynyard and Barangaroo Stations as well as direct links to other Sydney Metro lines, suburban rail services and bus services. In addition, escalators and lifts will provide level access between OβConnell and Bligh Streets.
The NSW government announced the development of the Hunter Street Station in 2018. The location of the new station was confirmed in May 2021. The environmental impact assessment report was released during the same year, following which the planning approval for the project concept was received.
The proposed designs for two entrances to the Hunter Street Station were released in September 2022. Tunnelling and station excavation was approved in 2022.
Construction of the station details
Tunnelling works at the Hunter Street East site began in April 2023, with a road header tunnelling machine for excavating a temporary decline access tunnel. Once the drop has been built, tunnelling will continue into the underground station cavern and turnback tunnels.
Site preparation, service identification and relocation, geotechnical studies, site surveying, structural demolition, scaffolding and other pre-construction works are currently ongoing at the site.
Tunnelling works at the Bligh Street site are set to begin in the next few months and will continue at both the East and West entrance sites until mid-2025.
Above-station developments
The Hunter Street development will feature two over-station development towers over the east and west stati