ScopeThe 979-foot long bridge was originally built in 1938 and was rehabilitated in 1981 but severe deterioration is now evident throughout and the structure must be studied for either rehabilitation or replacement. The estimated total cost of 49.45 million assumes a bridge replacement which is substantially more expensive than a rehabilitation. The existing sidewalks will be replaced with standard SHA and ADA compliant sidewalks. The existing lighting system will also be upgraded.
🔍 Key Information
📄
Tender Reference No.
448300028
📅
Publication Date
26 Oct 2019
💰
Estimated Value
USD 49450000
🌐
Sector
Consultancy
📅
Deadline
31 Dec 2030
📝
Notice Type
Projects
📍
Location
United states
📑
Contract Duration
11 Years 2 Months 5 Days
📁