Scope :
Siam Cement Group (SCG) has begun construction of a commercial heat battery supplied by Rondo Energy at its cement plant in Saraburi Province. It will be the first heat battery in Southeast Asia and the first heat battery deployed at a cement plant.
The project is a collaboration between Rondo Energy and SCG Cleanergy, a wholly owned subsidiary of SCG. Rondo Heat Batteries capture intermittent electricity and store energy as high temperature heat in bricks, to deliver continuous industrial heat and power on demand. This installation will convert local solar power into continuous zero-carbon heat and power for cement production.
Electrification of cement production requires a large-scale and low-cost energy storage solution, as renewables are not available 24/7 but cement production needs to be.
π Key Information
π
Tender Reference No.
504282474
π
Publication Date
28 May 2024
π°
Estimated Value
N/A
π
Sector
Energy, Power and Electrical
π
Deadline
31 Dec 2026
π
Notice Type
Projects
π
Location
Thailand
π
Contract Duration
2 Years 7 Months 3 Days