📋 Tender Overview
Project Description: The Harwich Road over Downie Drain Culvert Rehabilitation Project consists of concrete repairs, waterproofing of the deck and erosion protection. This project includes shallow surface concrete repairs, waterproofing of the concrete deck, sloped rip-rap erosion protection, and reinstatement of the granular road surface. This project will be in the design stage in 2026 with anticipated tender between April and June 2027, with the 2-year construction timing window beginning July 2027 until December 2028.