Location Harbin Taiping international airportScopeThe second phase expansion project of Harbin Airport with a total investment of approximately 9.658 billion yuan.The second-phase expansion project of Harbin Airport is designed to meet the annual passenger throughput of 38 million passengers and cargo and mail throughput of 300000 tons. The main construction content includes airport engineering air traffic control engineering fuel supply engineering automobile gas station engineering etc. The total investment of the project is about 9.658 billion yuan of which the airport project is 9.192 billion yuan. The specific construction project is to build a 3600-meter-long 45-meter-wide East Second Runway and the corresponding taxiway system at 760 meters east of the existing runway. The district level index is 4E a new station with 90 seats and a freight station of 20000 square meters will be built and facilities such as navigation lights fire fighting and rescue power supply and water supply will be built.The terminal appears as a snowflake referencing the regions immense amounts of snow that falls in the region. the design simultaneously mimics the gentle slopes of chinas vast northern plains with an undulating topography that rises and falls in response to the buildings program. The capital of chinas Heilongjiang province Harbin serves as one of the largest transportation hubs in the region. covering an area of 3300 hectares terminal 3 of Harbin airport will contain a series of ancillary airport facilities including ground transportation hubs hotel retail and parking lots. despite the buildings inevitable size MADs design seeks to establish an architectural program that is human-scale efficient and energy saving. the schemes snowflake-shaped five-finger departure corridors greatly shorten the time it takes for passengers to arrive at their gate while also minimizing congestion and improving the overall efficiency of the airport apron. meanwhile ridges on the roof function as skylights flooding internal spaces with daylight and reducing the need for artificial illumination. the interior is populated with indoor gardens that offer opportunities for reflection and tranquility. the ground transportation center GTC hub brings high-speed rail municipal subway lines airport buses and other urban transport together connecting Harbin city to the airport. by 2030 terminal 3 of Harbin Taiping international airport is expected to reach an annual throughput of 43 million passengers with approximately 320000 outgoing flights per year. MADs concept strives to bring humanity nature and the local environment together with a highly-functional architectural program.As the capital of Heilongjiang Province Harbin occupies an important strategic position in the core of Northeast Asias hinterland and serves as one of the largest transportation hubs of the region.Covering an area of 3300 hectares
π Key Information
π
Tender Reference No.
444394182
π
Publication Date
20 Jul 2021
π°
Estimated Value
USD 1400000000
π
Sector
Infrastructure and construction
π
Deadline
31 Dec 2030
π
Notice Type
Projects
π
Location
China
π
Contract Duration
9 Years 5 Months 11 Days
π
Documents & Downloads
No documents found
π·οΈ CPV
No CPV found