Renewable Energy Infrastructure and construction

Guinea Ppf Preparatory Tender

🏛️ MINISTERE DU PLAN ET DE LA COOPERATION INTL
📄 Tender ID: 500735448 📅 Published: 17 Feb 2024

📋 Tender Overview

Approval Date 23 Nov 2023
Planned Completion Date 31 Dec 2026
Last Disbursement Planned Date 31 Dec 2026
Sovereign / Non-Sovereign Sovereign
Sector Power
DAC Sector Code 23630
Commitment U.A 3,446,265
Status Approved
Project General Description

This intervention has been designed to enable feasibility and institutional studies to be carried out. The Morisanako and Grand Kinkon hydroelectric schemes are also included among the priority generation projects in the revised ECOWAS master plan for the development of electricity generation and transmission capacity. The rehabilitation and reinforcement of the distribution networks of the Tinkisso system will enhance the results of the 225 kV Guinea-Mali Electricity Interconnection Project (PIEGM). The feasibility studies will ensure good quality at the entrance to these projects, which could constitute future operations. The main deliverables are: (1) for each hydropower plant: (i) a final ODA study report; (ii) a final ESIA report, including an environmental and social management plan (ESMP); (iii) a comprehensive resettlement plan (CRP) validated by the stakeholders; (iv) a climate change vulnerability analysis; (v) an assessment of the profitability of the planned investments; (vi) tender documents (DAO) for the implementation of public-private partnership (PPP) projects ; (2) for the rehabilitation and reinforcement of the MV/LV network of the Tinkisso system (Dabola-Bissikirima-Dinguiraye and Dabola-Faranah): (i) a final DPA study report; (ii) a final ESIA report, including an environmental and social management plan (ESMP); (iii) an assessment of the profitability of the planned investments; (iv) a tender dossier for the works; (3) as regards the institutional study to finalise the framework law: (i) a finalised electricity framework law that takes into account energy efficiency and renewable energies; (ii) implementing regulations; (4) two audit reports on the accounts.
Project Objectives

The aim of this project is to finance the preparatory studies for the Morisakano and Grand Kinkon hydroelectric power station projects, the rehabilitation and reinforcement of the MV/LV networks of the Tinkissso system and the finalisation of the framework law for the electricity sub-sector.
Beneficiaries

The main beneficiaries are the Guinean authorities and stakeholders in the country's energy system.
Participating Organization
Funding
African Development Fund
Implementing
MINISTERE DU PLAN ET DE LA COOPERATION INTL


🔍 Key Information

📄
Tender Reference No.
500735448
📅
Publication Date
17 Feb 2024
💰
Estimated Value
N/A
🌐
Sector
Renewable Energy
📅
Deadline
31 Dec 2026
📝
Notice Type
Projects
📍
Location
Guinea
📑
Contract Duration
2 Years 10 Months 14 Days

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
59
days remaining · 31 Dec 2026
🔔 Set Alert

🧭 Quick Facts

Authority MINISTERE DU PLAN ET DE LA COOPERATION INTL
Country Guinea
State / UT N/A
Tender Type Project Information
Currency N/A
Similar Tenders
Loading similar tenders…