Consultancy Oil and Gas Infrastructure and construction

Greater Sunrise Development Tender

πŸ›οΈ TIMOR GAP
πŸ“„ Tender ID: 479596850 πŸ“… Published: 20 Oct 2022

πŸ“‹ Tender Overview

Location : JPDA between East Timor (Timor-Leste) and Australia

The Greater Sunrise development, which includes the Sunrise and Troubadour gas and condensate fields, is located in waters between East Timor (Timor-Leste) and Australia.

Australian petroleum exploration and production company Woodside Energy Group is the operator of the project with 33.44% participating interest. Timor-Leste's national oil company Timor GAP holds a 56.56% stake, while the remaining 10% is owned by Japan’s Osaka Gas.

The two fields were first discovered in 1974.

However, a maritime border dispute between East Timor and Australia delayed the development of the fields.
A new treaty was signed in 2018 which also enabled the two countries to proceed with the development of the Greater Sunrise gas fields together. The East Timor and Australian governments and the Sunrise Joint Venture are holding talks to finalise a new Greater Sunrise Production Sharing Contract.

The fields hold gross contingent resources of 5.1 trillion cubic feet (Tcf) of dry gas and 225.9 million barrels of condensate.

The project, expected to commence natural gas production by 2028-30, will strengthen the energy and climate security of Timor-Leste. Greater Sunrise will provide Timor-Leste with energy for domestic use as well as for exports.

Greater Sunrise development will feature production wells and wellstream gathering infrastructure (flowlines and risers), a produced water re-injection well and infrastructure, reservoir production management and wells control and services functions among others.

The subsequent development will involve transporting the gas produced to an LNG plant in East Timor or Australia. The development concept is yet to be finalised.

According to the 2018 Maritime Boundaries Treaty, revenue generated from the Greater Sunrise will be shared 70/30 in Timor-Leste’s favour if the field is developed with a pipeline to Timor-Leste.

If the development concept involves a pipeline to Australia, Timor-Leste’s revenue share will increase to 80%.

The life of the field is estimated to be approximately 30 years.
Contractors involved

The front-end engineering and design (FEED) and detailed marine survey (DMS) for the offshore pipeline from the Greater Sunrise field to Timor Leste was awarded to Wood Group Indonesia.

πŸ” Key Information

πŸ“„
Tender Reference No.
479596850
πŸ“…
Publication Date
20 Oct 2022
πŸ’°
Estimated Value
N/A
🌐
Sector
Consultancy
πŸ“…
Deadline
31 Dec 2030
πŸ“
Notice Type
Projects
πŸ“
Location
East timor
πŸ“‘
Contract Duration
8 Years 2 Months 11 Days

πŸ“ Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
πŸ•’ Submission deadline
1520
days remaining Β· 31 Dec 2030
πŸ”” Set Alert

🧭 Quick Facts

Authority TIMOR GAP
Country East timor
State / UT N/A
Tender Type Project Information
Currency N/A
Similar Tenders
Loading similar tenders…