📋 Tender Overview
Project Description: The sanitary sewer portion of this project consists of removing the existing combined sewer. The installation will involve approximately 800 meters of sanitary sewer, a total of 13 manholes, and 38 lateral service connections. The storm sewer portion of this project involves installing approximately 700 meters of storm sewer. It will include a total of 11 manholes, 34 catch basins, and 38 lateral service connections. The water main portion of this project entails replacing the existing water main with approximately 700 meters of water main. It will also involve replacing a total of 38 water services and 5 fire hydrants. As part of the reconstruction, the concrete sidewalk, concrete curb, and paved roadway will be replaced. Design to commence in 2026, with construction in 2027.