📋 Tender Overview
Description:This project would retrofit the Golden Gate Bridge to withstand a maximum credible earthquake (magnitude Richter of 8.3)
occurring on the nearby San Andreas or Hayward Faults. Seismic retrofit construction has been divided into three phases:
Phase 1 includes implementation of seismic retrofit measures to the north approach viaduct and implementation of
environmental mitigation measures. Phase 2 includes implementation of seismic retrofit measures to the south viaduct,
south anchorage housing, Fort Point Arch, pylons S1 and S2, and utility modifications throughout the south approach
structures. Phase 3 includes implementation of seismic retrofit measures to the suspension bridge, south pier and fender,
north pier, north anchorage, and pylon N1. Earmarks: HBB SAFETEA earmark $50M (for first year see MRN970016)