📋 Tender Overview
Description: The Asset Management Plan for this facility has identified several asset components that have or are reaching the end of their lifecycle. This is an ongoing annual budget which will vary each year depending on asset lifecycle works to be undertaken. Ongoing funding is required to sustain the optimal life cycle of the building and ensure it continues to meet legislative requirements. Asset Components includes mechanical, structural, electrical, fire, plumbing, lifts, security, fencing, communication, road works, drainage and grandstands. Funding from 2021/22 to 2023/24 of approximately $500k each year for the renewal of the outdoor end of life criterium track and associated assets including track works, drainage, signage, fencing, lighting, pedestrian control. The 2022/23 budget will be used to fund continuation of the criterion track, drainage, fencing, lighting, activity monitor and any unplanned building component/system failures. There is approximately 11,000 m2 of surface track area. During 2019/20, stage 1 completed 15% of track subgrade structural upgrade. Stage 2 in 2020/21 completed design and planning for these works for delivery the following 3 years