📋 Tender Overview
Scope of Work:
Gates 230/70 kV Transformer Addition Project.
Description:
This project was submitted by PG&E to address 70 kV and 115 kV line overloads in Gates area. The Gates 230/70 kV transformer bank #5 serves as the main source feeding the local 70 kV sub-area. Besides Gates 230/70 kV transformer bank #5, the other two sources feeding the load pocket include the Schindler 115/70 kV transformer bank #1 and the Coalinga #1- San Miguel 70 kV line. The load in this area is mainly driven by the distribution customers at Calflax, Coalinga #1, Coalinga #2, Huron, and Schindler substations. This project mitigates the NERC TPL-001-5 Category P1 and P3 violations. For an outage of Gates 230/70 kV transformer bank #5, all the loads in this area will be served through Schindler 115/70 kV transformer bank #1 and the Coalinga #1- San Miguel 70 kV line resulting in overloads on multiple transmission elements, such as Schindler-Five Points SW STA 70 kV line, Schindler-Coalinga #2 70 kV line, Five Points SW STA–Huron-Gates 70 kV line and Schindler 115/70 kV transformer bank #1. Widespread low voltages were also observed in the long-term scenario. In addition there were category P3 contingencies involving Gates 230/70 kV transformer bank #5 resulting in thermal and voltage violations.
The project scope includes:
• Installing an additional 230/70 kV transformer bank at Gates substation;
• Gates 70 kV bus conversion; and
• Upgrade limiting elements to achieve full bank capacity.
This project will establish Gates substation as a stronger source for the local 70 kV area. This project has a cost estimate of $36M - $72M and expected in-service date of May 2030 or earlier.