Location Guadalajara Type of investment GreenfieldSubsector Transport Storage DistributionActive Gas pipeline 305 km Scope The project consists of the design construction operation and maintenance of a gas pipeline with a capacity of 886 million cubic feet per day MMPCD. The approximate length of the gas pipeline is 305 km and 36 inches in diameter.The pipeline will be interconnected with the Tula-Villa de Reyes gas pipeline and the La Laguna-Aguascalientes gas pipeline. This system will supply natural gas to the new generation plants in the area.
π Key Information
π
Tender Reference No.
444752100
π
Publication Date
08 Jun 2019
π°
Estimated Value
MXN 5880000000
π
Sector
Oil and Gas
π
Deadline
31 Dec 2043
π
Notice Type
Projects
π
Location
Mexico
π
Contract Duration
24 Years 6 Months 23 Days
π
Documents & Downloads
No documents found
π·οΈ CPV
No CPV found