Scope of Work:
Gas Growth Integrated Project (GGIP).
Description:
Iraq Government along with TotalEnergies (45%), QatarEnergy (25%), Iraq's National oil company, and the Basrah Oil Company (30%) is undertaking the construction of the Gas Growth Integrated Project (GGIP) in southern Iraq.
The Project is divided into four different stages. It includes CSSP, AGUP, GMP, and 1GW Solar Energy Project. The US$27000 million project includes the following: Common Seawater Supply Project (CSSP): 1. Construction of de-oxygenation tower and boosting pumps 2. Construction of a water disposal unit 3. Construction of a water handling and injection system 4. Construction of eight interconnecting stations and 10 delivery stations 5. Installation of high-flow water injection pumps 6. Installation of sand filters 7. Laying of 426km pipeline 8. Drilling of injection well & separation challenges 9. Installation of process monitoring and control systems 10. Construction of seawater treatment plant (1192404m3/day) 11. Construction of seawater intake facility 12. Construction of a power plant (430MW) 13. Construction of pumping stations 14. Construction of pre & post-treatment facilities 15. Construction of chemical units 16. Installation of dual media filter 17. Installation of the polishing filter 18. Installation of the safety filter 19. Construction of accommodations and administration buildings 20. Construction of potable water & sewage treatment systems 21. Construction of public amenities
Associated Gas Upstream Project: 1. Upgrade of existing gas flare tips with new tips 2. Upgrade of the existing steam system 3. Installation of new steam pipeline 4. Construction of an acid gases injection well 5. Construction of a wastewater injection well 6. Construction of a building of separation, stabilizing and sweetening facilities of gas condensates 7. Construction of a storage tank for gas condensates 8. Associated facilities.
Artawi Oil Field Development (Central Gas Complex in Artawi)/ GMP: 1. Construction of gas complex 2. Installation of gas gathering unit 3. Construction of gas processing units 4. Installation of the compressor unit 5. Installation of the separation unit 6. Associated facilities
Artawi 1000 MW Solar PV Plant: 1. Construction of a substation 2. Installation of 132 kV booster station 3. Installation of solar panels 4. Installation of transformers 5. Laying of transmission lines 6. Construction of related infrastructure
Other Owners:
2) Iraq National Oil Company (INOC)
Hamourabi Building, Karkh Baghdad Iraq
3) Basrah Oil Company
Bab Al Zubair Area
Basra; Al-Basrah; Postal Code: 61001
Iraq
http://boc.oil.gov.iq/