Scope :
Galiste is a 193.5MW hydro power project. It is planned on Crna Reka river/basin in Macedonia. The project is currently in announced stage. It will be developed in single phase. The project construction is likely to commence in 2023 and is expected to enter into commercial operation in 2026.
The project is being developed and currently owned by Elektrani na Severna Makedonija.
Galiste is a reservoir based project. The gross head and net head of the project will be 129.2m and 128.57m respectively. The project is expected to generate 262.5 GWh of electricity. The project cost is expected to be around $269.558m.
The hydro power project consists of 3 turbines, each with 64.5MW nameplate capacity.
The project will have 3 electric generators installed at the project site. The generator capacity is likely to be 71.9 MVA.
Development Status
The project construction is expected to commence from 2023. Subsequent to that it will enter into commercial operation by 2026.
๐ Key Information
๐
Tender Reference No.
483577630
๐
Publication Date
24 Jan 2023
๐ฐ
Estimated Value
N/A
๐
Sector
Renewable Energy
๐
Deadline
31 Dec 2026
๐
Notice Type
Projects
๐
Location
Macedonia, the former yugoslav republic of
๐
Contract Duration
3 Years 11 Months 7 Days