Description:
Weber 60 kV substation is in San Joaquin County. The Weber-French Camp #1 and #2 60 kV lines serve customers through French Camp, JM Manufacturing, Cargill and Dana substations. Weber substation has been the main source for serving the load in this pocket. In 2023-2024 TPP assessment studies, P1 contingencies overloads were observed on Weber 60 kV line #2 (Weber – French Camp) starting in the near-term. Singificant distribution load interconnections have been requested in this area. Weber substation has already been serving at its maximum capacity. Looping French Camp substation into Bellota-Tesla #2 230 kV line and adding a new 230 kV bus at French Camp and distribution banks connected to the 230 kV bus would mitigate these issues.
The ISO recommends approval of the French Camp Reinforcement Project with the following scope • Loop French Camp substation into Bellota-Tesla #2 230 kV line to add a new 230 kV bus at French Camp. The total length of transmission circuit is about 4.4 miles.
The total estimated cost of this project is $42.1M - $84.2M. The expected in-service date of this project is May 2030 or earlier. Operating solutions will be relied upon in the interim.
🔍 Key Information
📄
Tender Reference No.
504882324
📅
Publication Date
14 Jun 2024
💰
Estimated Value
N/A
🌐
Sector
Energy, Power and Electrical
📅
Deadline
31 May 2030
📝
Notice Type
Projects
📍
Location
United states
📑
Contract Duration
5 Years 11 Months 17 Days
📁