📋 Tender Overview
Description:Fremont: At the Fremont/Grimmer and Fremont/Eugene intersections: Construct protected intersections, as well as
elevated bikeway between the two intersections along Fremont Boulevard including removal of existing right turn slip lanes,
elevated/extended curb returns, high visibility crosswalks, intersection lane reconfiguration, and traffic signal replacement.
The project will also install new video-based traffic and bicycle detection at the various approaches. The project will
connect to a proposed Class I multipurpose trail (currently under design) along Grimmer Boulevard, connecting nearby
high-density residential complexes to nearby commercial centers, job centers, recreational destinations, and high-quality
transit (future Irvington BART station).