ScopeThe project will duplicate and electrify 8km of the Stony Point Rail Line from Frankston to Baxter.BenefitsThe Stony Point Rail Line is a 31km single-track non-electrified rail line that connects Frankston to Stony Point on the Mornington Peninsula. At present metropolitan electric trains operate between Melbourne and Frankston on an electrified double track. However diesel trains operate less frequently between Frankston and Stony Point. The majority of the Mornington Peninsulas population is located south of Frankston. This requires lengthy bus connections to Frankston for people needing to access Melbourne.The project will enable high capacity metropolitan electric trains to operate from Frankston to Baxter. This will increase capacity reduce travel times and improve service reliability.
π Key Information
π
Tender Reference No.
462941406
π
Publication Date
09 Jun 2021
π°
Estimated Value
N/A
π
Sector
Railways
π
Deadline
31 Dec 2026
π
Notice Type
Projects
π
Location
Australia
π
Contract Duration
5 Years 6 Months 22 Days
π
Documents & Downloads
No documents found
π·οΈ CPV
No CPV found
Need help with this bid?
Our bid experts can help you find, evaluate & win more tenders.