📋 Tender Overview
Scope of Work:
To Deploy 290-MW battery energy storage system (BESS) directly connected to the local Exeter substation.
Description:
The facility, which will have a discharge duration of six hours, is expected to be connected to the grid in 2027. Once operational, it will be capable of powering over 650,000 homes.