📋 Tender Overview
Project Description: The Erieau Road over McGregor Holdaway Drain (North) Culvert Replacement Project consists of removal and replacement of the existing concrete culvert including wingwalls and footings. This project includes installation of a new concrete box culvert, extending the culvert ends with sloped rip-rap erosion protection, reinstating the asphalt road surface and widening the shoulders over the crossing. This project will be in the design stage in 2027 with anticipated tender between July and September 2027, with the 2-year construction timing window beginning January 2028 until December 2029.