📋 Tender Overview
Project Description: As identified in the 2021 Ontario Structure Inspection Manual (OSIM) inspection, due to the condition and age of the structure, which was confirmed in a detailed condition assessment in 2022, this bridge is in need of replacement. The replacement structure will be longer to allow for future road improvements such as bike lanes and sidewalks. On May 5, 2023, RC Spencer Associates Inc. submitted a proposal for Consulting Engineering Services to complete the design, contract administration, and inspection to complete this bridge replacement.