Banking, Finance, Insurance and Securities (BFIS) Services Environment and Pollution

Enhancing Sustainability Financing Tender

🏛️ ASIAN DEVELOPMENT BANK
📄 Tender ID: 521918286 📅 Published: 22 Aug 2025

📋 Tender Overview

Project Name
Enhancing Sustainability: Financing for the Rogun Hydropower Project
Project Number
58097-001
Country / Economy
Tajikistan
Project Status
Proposed
Project Type / Modality of Assistance
Grant
Loan
Source of Funding / Amount
Grant: Rogun Hydroelectric Powerplant
Asian Development Fund US$ 210.00 million
Loan: Enhancing Sustainability: Financing for the Rogun Hydropower Project
Concessional ordinary capital resources lending US$ 290.00 million
Sector / Subsector
Energy / Large hydropower generation

Gender
Effective gender mainstreaming
Description
The Rogun Hydroelectric Power Plant (HPP) is a large project under construction located on the Vaksh river about 110km East-Northeast of Dushanbe in Tajikistan and, when completed, will be the most upstream power plant of total 6 HPPS on the Vakhsh River. It will have an installed capacity of 3,780 MW, a 335-meter-high dam, 13.3 km3 reservoir and expected annual generation of 14,400 GWh.

The Rogun HPP was designed in the 1970s and after several start-and-stop cycles the project implementation was resumed in 2008 with financing from the Government of Tajikistan. The pace of construction has been impacted by the availability of financial resources and exposes the project to significant risks.

The Rogun HPP will be the largest HPP in the region and has the potential to generate a multitude of benefits for Tajikistan and the broader Central Asia region. It can play an important role for Tajikistan's economy by providing reliable green electricity to meet growing demand at affordable cost, eliminating load shedding during winter months when supply cannot meet demand. In winter 2023-2024 50-70% of customers only had electricity for 6 to 10 hours daily. With the large reservoir it will be able to provide balancing services for the electricity network. The existing Vaksh river HPP cascade has been designed to withstand floods with a 10,000-year return period only. Today's best practice is to design large dams to withstand floods estimated on the probable maximum flood (PMF) concept. Such a PMF event would end disastrously if the existing HPPs are not upgraded on the cascade. The large reservoir in combination with the operating regime of the Rogun HPP will be able to protect all downstream powerplants from such a disastrous PMF event.

At a regional level, the project is expected to export 70 percent of its total generation, providing a significant source of export revenue to Tajikistan and contributing to accelerated GDP growth. This can have positive impacts on the social, education and healthcare sector due to increased availability of public resources.

Project Rationale and Linkage to Country/Regional Strategy
One of the key development priorities of the government is to complete the project in a sustainable manner. From 2007 to 2022 the government spent around $3.3 billion on the Rogun HPP and based on latest estimates another $6.3 billion will be required to co

🔍 Key Information

📄
Tender Reference No.
521918286
📅
Publication Date
22 Aug 2025
💰
Estimated Value
N/A
🌐
Sector
Banking, Finance, Insurance and Securities (BFIS)
📅
Deadline
31 Dec 2028
📝
Notice Type
Projects
📍
Location
Philippines
📑
Contract Duration
3 Years 4 Months 9 Days

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
787
days remaining · 31 Dec 2028
🔔 Set Alert

🧭 Quick Facts

Authority ASIAN DEVELOPMENT BANK
Country Philippines
State / UT N/A
Tender Type Project Information
Currency N/A
Similar Tenders
Loading similar tenders…