Project LocationNorth LondonScopeThis involves construction of the new facility in the Lee Valley in Edmonton to replace the existing 45-year-old waste incinerator.Preparatory works will include installing works accommodation for the team on designated areas of Lee Valley Regional Park and preparing the laydown area to provide space to support construction onsite.The works have been scheduled to take place over the next 10 years and have been phased to allow the existing EfW facility to continue to operate during this time.Plans also include building a new reuse and recycling centre as well as EcoPark House an office block with a visitor reception centre.When complete it will be capable of incinerating 700000 tonnes of non-recyclable residual waste every year and produce 50 megawatts of electricity enough to power 127000 homes.It is estimated the 500m project could save up to 900m over 27 years.hair of NLWA stated that this is a momentous time for North London Waste Authority. The Project is pivotal for creating a more efficient solution to our waste that will better serve our residents. They are excited to start putting plans into action for asustainable future of waste in north London.
π Key Information
π
Tender Reference No.
441362788
π
Publication Date
24 Jan 2019
π°
Estimated Value
500000000
π
Sector
Energy, Power and Electrical
π
Deadline
31 Dec 2029
π
Notice Type
Projects
π
Location
United kingdom
π
Contract Duration
10 Years 11 Months 7 Days
π
Documents & Downloads
No documents found
π·οΈ CPV
No CPV found
Need help with this bid?
Our bid experts can help you find, evaluate & win more tenders.