📋 Tender Overview
Scope of Work:
Eldorado 230 kV Short Circuit Duty Mitigation Project.
Description:
This project was submitted by Southern California Edison as a reliability need to address the short circuit duty concerns at the joint-owned Eldorado 230 kV bus. The recommended scope of this project included splitting the Eldorado joint-owned 230 kV bus into two sections using sectionalizing breakers and associated equipment, extending the bus with two new positions to the east of the current structure and relocating 230 kV lines and other equipment to balance the short circuit contribution. The increased short circuit levels are due to the addition of renewable generation in the area, along with associated transmission upgrades, interconnecting to NV Energy, Los Angeles Water and Power, and ISO controlled SCE facilities. The short circuit levels are expected to exceed the breaker ratings by 2024. The proposed project will reduce the short circuit current levels at the Eldorado joint-owned 230 kV bus by about 21.4 kA to about 53.9 kA, well below the 63 kA breaker ratings. The estimated cost of this project is $67 Million with $48.8 Million funded by SCE, and $18.2 Million being allocated to LADWP and NVE. The proposed in-service date of the project is Q4 2029.