📋 Tender Overview
Scope :
The 480km-long, upcoming EIIJ project will be operated by Nigerian Gas Processing and Transportation. This onshore, gas pipeline, with a maximum diameter of 36 inches, will start in Lagos (Nigeria) and ends in Kwara (Nigeria).
The EIIJ project is expected to commence operations in 2026 and will be owned by Nigerian National Petroleum.
The EIIJ project is associated with the 446km Escravos–Lagos (NGC).
During the period 2021-2025, the EIIJ project is expected to witness an estimated capex of $212.83m.