📋 Tender Overview
AGENCY:Fresno County
FTIP: 25-00
GROUPED LIST PROJECT:FRE190008
PROJECT ID:FRE230012
Description:Easton within the bounding streets of E Fantz Ave. in the north, W
Morton Ave. to the south, S Fig Ave. to the west, and S Lily Ave. to
the east. Sidewalk replacement including non-ADA compliant ramps,
Curb and gutter replacement, completed as necessary to reestablish
the drainage pattern to existing inlets, Road widening to proposed
curb and gutters, Drainage work, which will vary from surface flow to
underground pipe, and potential construction of a ponding basin,
depending on the condition of each flood area and existing facilities,
Water valves and sewer manholes adjustment, as necessary.