📋 Tender Overview
Proposed Project
The Overall Development Objective (ODO) of the proposed project is to expand the terminal apron.
CY 2025: Preliminary Engineering Report.
CY 2026: NPE Funded Design Only.
CY 2027: Construct ODO.
Project Justification
The apron becomes completely full to aircraft several times throughout the year. The existing apron pavement is too small for the transient traffic demand at the airport. The issue has been consistently documented by airport staff. The
sponsor is currently working through a master planning study currently and intends to provide documented aircraft demand that satisfies FAA's aviation demand criteria for the apron expansion due to increase in both local and transient traffic. Airport Information
• Regional Business Airport
• Based Aircraft & Operations: 75 (3 jets) & 91,280
• Runway 17/35: 6,000 x 100