Water and Sanitation Banking, Finance, Insurance and Securities (BFIS) Services

Drinking Water System Tender

🏛️ NORTH AMERICAN DEVELOPMENT BANK
📄 Tender ID: 522010381 📅 Published: 25 Aug 2025

📋 Tender Overview

Description: Background
Chronic problems in its wastewater system, including sanitary sewer overflows resulting in untreated transboundary discharges to the U.S., prompted the City, in coordination with NADBank, the Mexican National Water Commission (CONAGUA) and the U.S. Environmental Protection Agency (EPA), to evaluate the underlying conditions causing the wastewater infrastructure issues. Among the suspected causes was significant inflow and infiltration of water into the sewer system due to leaks in the water distribution system.

A study conducted in 2022 confirmed that the volume of water extracted and distributed within the city was more than twice the national per capita average established by CONAGUA. The study concluded that most of this water is being lost in distribution, creating infiltration problems in the sewer system. Moreover, due to this high water consumption, the shared aquifer with Naco, Arizona, is also vulnerable to over pumping and an accelerated depletion rate.

One of the actions identified to remedy this situation is the implementation of a metering system so that the utility can obtain accurate data on actual water used by its customers, quantify water losses in the distribution system and eventually pinpoint their source. Armed with this knowledge, the utility will also be in a better position to take actions aimed at promoting water conservation among its users, as well as reduce its pumping requirements and the associated costs.

To offset the energy needed to operate the water pumping facilities and improve the sustainability of the utility, the State of Sonora committed to providing an alternative energy source generated by renewable energy. Although the solar panels and related components were installed in 2018, the system is not operational and requires additional investments to be connected to the grid. OOMAPAS also removed and stored some of the panels to protect them from vandalism or other threats. Therefore, OOMAPAS is also seeking support to complete the connection and start-up of the solar energy system.

Description
The Project consists of installing water meters and completing the connection and startup of the existing solar energy system for three water production wells. The main project components include:

Purchase of up to 2,400 remote-read water meters and installation of 2,326 meters for existing water accounts;
Installation of solar energy system, consisting of 1,451 photovoltaic modules with a nominal capacity of 250-255 watts mounted on fixed arrays, along with 16 inverters coupled to three transformers; and
Purchase and installation of cables to connect the solar energy system to the power grid, reinstallation of panels removed and stored by OOMAPAS, and start-up and testing of the new energy source. Project implementation will include disconnecting each solar panel from its junction box and checking that the panel, relay switches, fuse connectors and cables are all in good wor

🔍 Key Information

📄
Tender Reference No.
522010381
📅
Publication Date
25 Aug 2025
💰
Estimated Value
N/A
🌐
Sector
Water and Sanitation
📅
Deadline
31 Dec 2027
📝
Notice Type
Projects
📍
Location
United states
📑
Contract Duration
2 Years 4 Months 6 Days

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
412
days remaining · 31 Dec 2027
🔔 Set Alert

🧭 Quick Facts

Authority NORTH AMERICAN DEVELOPMENT BANK
Country United states
State / UT N/A
Tender Type Project Information
Currency N/A
Similar Tenders