📋 Tender Overview
ROUTE (MILEPOSTS):
COUNTY: Salem
Description: NEW JERSEY DEPARTMENT OF TRANSPORTATION plan for The medium voltage cable system is a continuous loop between structures 1 and 2. The line carries 12.6kv
and provides power to all of our electrical equipment and systems on the DMB. The line is approximately
25 years old and approaching the end of its service life due to vibration on the DMB, age and exposure to
UV and other environmental impacts. This is the first phase of what will likely be multiple phases based
on results of resilience testing. This first phase replaces the cable between Anchorage 1D and Pier 1E-5.
This project has an estimated DRBA cost of $600,000 in 2025 and $2,400,000 in the out years. This effort has
no anticipated annual operating cost impact.