Project Limits: Milepost 3.05 to 5.32
Federal Classification: Rural Minor Collector (08)
Project Description: This project will reconstruct the
roadway section to improve the structural strength of the
roadway. This will be completed using full depth reclamation
(FDR) as the construction method. Shoulder rock will be placed
and the roadway restriped. The clear zone will be reviewed and
issues addressed.
Basis for Project: Increased truck traffic has caused severe
damage to the roadway because this roadway has an inadequate
roadway section to support frequent fully loaded trucks. It is
anticipated that this increase in truck traffic will continue as the
port develops.
Environmental/Safety Considerations: This area is developing including more industrial uses replacing
farms and vacant land outside of the levee. The original roadway was not constructed to a roadway standard
so the increased traffic loading is detrimental to the roadway structure. The large areas of distressed pavement
and potholes create hazardous driving conditions increasing the probability of accidents along this roadway.
Funding Sources: This project is being funded with local road funds and CRAB RAP grant funds.
🔍 Key Information
📄
Tender Reference No.
540159371
📅
Publication Date
13 Nov 2026
💰
Estimated Value
N/A
🌐
Sector
Transportation
📅
Deadline
31 Dec 2027
📝
Notice Type
Projects
📍
Location
United states
📑
Contract Duration
1 Year 1 Month 18 Days
📁