PROJECT DETAILS
Project number:
2023.2097.6
Status:
running project
Responsible organizational unit:
2B00 Asia II
Contact person:
Wolfgang Hesse wolfgang.hesse@giz.de
Partner countries:
Pakistan
SUMMARY
Goals:
Key players in the electricity sector have implemented regulatory and digital solutions for an energy transition
Client:
Federal Ministry for Economic Cooperation and Development
Project partners:
Ministry of Energy, Power Division
Financier:
not available
ORDER VOLUME
Overall project:
(including all previous, current and subsequent project phases, if applicable)
7 000 000 euros
Current project:
7 000 000 euros
COMBINED FINANCING
not available
PREVIOUS PROJECT
not available
SUCCESSOR PROJECT
not available
DURATION
Overall project:
(including all previous, current and subsequent project phases, if applicable)
11.12.2023 - 31.12.2026
Current project:
01.01.2024 - 31.12.2026
OTHER PARTIES INVOLVED
not available
FURTHER INFORMATION
Project website
not available
DEVELOPMENT POLICY IDENTIFIERS
Gender equality
Significant secondary objective
Climate change, greenhouse gas reduction
main goal
CRS KEY
23630 Transmission and distribution of electricity (interconnected networks)
EVALUATION
not available
PROJECT DESCRIPTION (DE)
Initial situation:
Pakistan's Nationally Determined Contributions (NDCs) to climate protection as of October 2021 stipulate that the country's greenhouse gas emissions should be reduced by 15 percent compared to 2015. The energy sector aims to make its contribution by increasing the proportion of energy from renewable sources. It is currently 30 percent (25 percent of which comes from hydropower, 5.4 percent is wind and solar energy or is generated from biomass). This share is to be increased to 60 percent by 2030. This leads to numerous technical challenges for electricity grid operators. Above all, expertise is required to develop methods that can be used to forecast how much electricity is generated from renewable sources in different areas. This will ensure grid access for energy from renewable sources without compromising grid stability or causing major power outages.
Objective:
The key players in the energy industry have implemented legal and digital solutions to facilitate the energy transition.
Approach:
The project supports the energy transition with the following measures:
1. Support the institutions in the Pakistani energy industry in implementing legal regulations and provisions as well as strategies for the expansion of renewable energies.
2. Implement a training and further education program for network operators and other institutions in the energy industry. The project aims to pass on the necessary specialist knowledge and the necessary digital skills so that an overall concept for the integration of electricity from renewable sources into the grid can be developed.
3. Implement technical measures in sel