📋 Tender Overview
Scope of WorkTo Develop Green energy complex at Bantry Bay in Ireland with 2.7 GW of offshore wind-based hydrogen production and 500 MW of green ammonia capacity.DescriptionThe two partners have initiated a feasibility study that will last about a year and after which they will apply for planning permission. The idea is to develop the scheme in two phases and the first one will focus on the construction of the hydrogen plant.The complex could be operational by 2028 when sufficient offshore wind power generation is expected to be available. The output of the planned facility will be used both domestically and internationally. The plant will operate alongside Zenith Energys existing Bantry Bay Terminal.