Location Chihuahua Type of investment BrownfieldSubsector Transport Storage DistributionActive Gas pipeline 23 km Scope The project consists of the design construction operation and maintenance of a gas pipeline with a capacity of 1220 million cubic feet per day MMPCD. The approximate length of the gas pipeline is 23 km in two sections. The first 42 inches and the second 36 inches.The San Isidro - Samalayuca gas pipeline transports natural gas from San Isidro to Central CC Norte III.
🔍 Key Information
📄
Tender Reference No.
444885704
📅
Publication Date
14 Jun 2019
💰
Estimated Value
MXN 2180000000
🌐
Sector
Oil and Gas
📅
Deadline
31 Dec 2042
📝
Notice Type
Projects
📍
Location
Mexico
📑
Contract Duration
23 Years 6 Months 17 Days
📁
Documents & Downloads
No documents found
🏷️ CPV
No CPV found