Location ChihuahuaType of investment BrownfieldSubsector Transport Storage DistributionActive Gas pipeline 32 km Scope The project consists of the design operation and maintenance of a gas pipeline with a capacity of 248 million cubic feet per day MMPCD. The approximate length of the gas pipeline is 32 km and 24 inches in diameter. The Topolobampo branch will transport natural gas from the El Encino-Topolobampo gas pipeline to the Topolobampo II and Topolobampo III combined cycle plants in the state of Sinaloa.
🔍 Key Information
📄
Tender Reference No.
444887018
📅
Publication Date
14 Jun 2019
💰
Estimated Value
MXN 1100000000
🌐
Sector
Oil and Gas
📅
Deadline
31 Dec 2043
📝
Notice Type
Projects
📍
Location
Mexico
📑
Contract Duration
24 Years 6 Months 17 Days
📁