Location Sonora Type of investment BrownfieldSubsector hydraulic energyActive 7 MW Hydroelectric Plant Scope The project consists of the design construction equipment installation operation and maintenance of the Necaxa 8 hydroelectric plant with a total capacity of 7 MW in the state of Puebla. The plant has the following characteristics Power zone National Export zone Central Export subzone Central Price zone Central Interconnection area NECAXA NEC-85.Contract number SLP2016010103-07 related to Clean Energy Certificates CEL for 33051 CEL Year with a bid price of MXN 4957722.
π Key Information
π
Tender Reference No.
444912882
π
Publication Date
15 Jun 2019
π°
Estimated Value
MXN 210000000
π
Sector
Energy, Power and Electrical
π
Deadline
31 Dec 2039
π
Notice Type
Projects
π
Location
Mexico
π
Contract Duration
20 Years 6 Months 16 Days
π
Documents & Downloads
No documents found
π·οΈ CPV
No CPV found