Location San Luis Potosi Type of investment BrownfieldSubsector Transport Storage DistributionActive Gas pipeline 19 km Scope The project consists of the design construction equipment installation operation and maintenance of a gas pipeline with a capacity of 276 million cubic feet per day MMPCD. The approximate length of the gas pipeline is 19 km and 24 inches in diameter. The Ramal Villa de Reyes pipeline transports natural gas to the plants located in Villa de Reyes in the state of San Luis Potos.
🔍 Key Information
📄
Tender Reference No.
444885724
📅
Publication Date
14 Jun 2019
💰
Estimated Value
MXN 157780780
🌐
Sector
Oil and Gas
📅
Deadline
31 Dec 2041
📝
Notice Type
Projects
📍
Location
Mexico
📑
Contract Duration
22 Years 6 Months 17 Days
📁
Documents & Downloads
No documents found
🏷️ CPV
No CPV found
Need help with this bid?
Our bid experts can help you find, evaluate & win more tenders.