Location SonoraType of investment GreenfieldSubsector Solar energyActive 200 MW Photovoltaic Park ScopeThe project consists of the design construction equipment installation operation and maintenance of the Bacabachi 1 photovoltaic power plant with a total capacity of 200 MW in the state of Sonora. The plant has the following characteristics Power area National Export zone Northwest Price zone Obregon Interconnection zone EL MAYO EMY-230 -230 . The contract term for power and energy is 15 years and 20 years for the CEL.
π Key Information
π
Tender Reference No.
444754035
π
Publication Date
08 Jun 2019
π°
Estimated Value
MXN 3128000000
π
Sector
Energy, Power and Electrical
π
Deadline
31 Dec 2035
π
Notice Type
Projects
π
Location
Mexico
π
Contract Duration
16 Years 6 Months 23 Days