Location SonoraType of investment GreenfieldSubsector Solar energyActive Photovoltaic Park 99 MW ScopeThe project consists of the design construction equipment installation operation and maintenance of the El Mayo photovoltaic power plant with a total capacity of 99 MW in the state of Sonora. The plant has the following characteristics Power zone National Export zone Northwest Price zone Obregon Interconnection zone EL MAYO- EMY-115 -115. The term of the contract for energy is 15 years and 20 years for the CELs.
π Key Information
π
Tender Reference No.
444753514
π
Publication Date
08 Jun 2019
π°
Estimated Value
MXN 1935000000
π
Sector
Energy, Power and Electrical
π
Deadline
31 Dec 2035
π
Notice Type
Projects
π
Location
Mexico
π
Contract Duration
16 Years 6 Months 23 Days