📋 Tender Overview
Description : This project was included in the 2022-2026 Financial Plan. Asphalt curb was installed along Helmcken in 1990’s. The curb has degraded and is ready for replacement. Surrounding developments have been required to install concrete curb, gutter and sidewalk. This section of infill would complete the north side of Helmcken from Burnside Rd W to Watkiss and could tie in with the 3 Helmcken development frontage works.