📋 Tender Overview
Summary:
Replace existing Bridge #94282 along Glenwood Avenue (CSAH 40) over Bassett Creek in the City of Minneapolis.
Purpose & Description:
The existing bridge (built in 1889) consists of a masonry arch that is entirely buried underneath Glenwood Avenue (CSAH 40). The culvert is in relatively poor condition, and therefore, has been classified as structurally deficient. Its masonry walls are showing signs of extensive deterioration that is allowing water to penetrate through the walls and floor of the structure. This structure is nearing the end of its useful life; therefore, a capital project is being recommended as routine maintenance activities are no longer cost effective in extending its useful life. Additionally, this structure is located immediately above other storm and sanitary utilities; suggesting relatively complicated underground conditions.
At this time, the specific type of improvement has not yet been determined. However, county staff will investigate options to preserve the existing structure as part of the project development process. An alternative to full replacement may be preferred as it would minimize disruptions to the travelling public. It is anticipated that any pavement, sidewalk, and drainage structures impacted by the project will be replaced in-kind. Without future improvements, the bridge structure will continue to deteriorate, and weight restrictions will likely be
required.
Scheduling Milestones (major phases only):
Activity Anticipated Timeframe
Planning 2021 - 2023
Design Q1 2024 - Q4 2025
Bid Advertisement Q1 2026
Construction Q2 2026 - Q3 2026
Completion Q2 2027