Scope of Work:
Cortina #1 60 kV Line Reconductoring Project.
Description:
The Cortina #1 60 kV line, situated in Yolo County, serves Dunnigan and Arbuckle substations in a radial manner. PG&E anticipates a significant increase in load at these substations, especially at Dunnigan due to its proximity to the I-5 transportation corridor. Both the Dunnigan and Arbuckle substations are operating at full capacity. PG&E has received a near-term 10 MW load interconnection request at the Dunnigan substation, scheduled for phased operation and connection to the transmission system. Currently, 0.7 MW of load has been online since 2023, with an additional 4.2 MW in queue to be energized in early 2024. Moreover, a 0.5 MW agricultural pump load and a 0.4 MW EV charging station submitted their applications in 2023. These new loads have raised concerns about potential overload and low voltage issues along the Cortina #1 60 kV line.
PG&E Planning conducted load interconnection system impact study for this load increase and identified normal overloads on multiple sections of the Cortina #1 60 kV line, with several buses
along the line potentially experiencing low voltage issues. The most severe of these issues may lead to overloading the Arbuckle-Dunnigan 60 kV section up to 140% of its summer normal rating and a voltage level as low as 0.87 p.u. at the Dunnigan bus in 2024. Even considering only normal distribution load growth, power flow results for the year 2035 also show P0 thermal overload at 113% of the line rating. The ISO concurs with PG&E’s findings and recommendation. As such, the ISO recommends approval of the Cortina #1 60 kV Line
Reconductoring Project with the following scope:
Reconductor ~15.4 circuit miles between the Cortina substation and Arbuckle substation (From Cortina to 015/259) on the Cortina #1 60 kV line with a larger conductor to achieve at least 818 Amps during normal conditions.
Reconductor ~10.8 circuit miles between the Arbuckle Substation and Dunnigan substation (From 015/260 to Dunnigan) on the Cortina #1 60 kV line with a larger conductor to achieve at least 818 Amps during normal conditions.
Remove any limiting components as necessary to achieve full conductor capacity. The total estimated cost of this project is $47.1 to $94.3 million. The expected in-service date of this project is May 2028. In the interim, the load ramp will be limited to the available capacity. Operating solutions will also be relied upon in the interim if needed.