📋 Tender Overview
Location Mexico City Type of investment GreenfieldSubsector Drainage SewerageActive Lagoon 25.90 hm3 Scope The project consists in the construction of 5 bodies of water with the purpose of increasing the regulation capacity of the rainwater that lead the 9 rivers of the east of the Valley of Mexico San Juan Teotihuacn Papalotla Xalapango Coxcacoaco Texcoco Chapingo San Bernardino Santa Monica and Coatepec as well as the modernization of the existing infrastructure.A joint capacity of up to 25.9 hm3 is considered so that the lagoon system will be able to regulate the volume of design avenues calculated with a train of storms of 8 days and return period of 50 years with which CONAGUA has decided that They are designed and built and can be discharged into the deep drainage system of the Valley of Mexico without affecting its operation.