π Tender Overview
Scope of Work:
Construction of Multiple Dams at Trojena mountain resort.
Description:
The project will create an artificial lake at the centre of the development, with the main dam to be constructed at a height of 145 metres and 475 metres long at its crest. A dam will also be constructed within the planned lake using 650,000 cubic metres of roller compact concrete (RCC), to create an island below the water level, which will be connected to the nearby Lake Village by an underwater tunnel. The landscaping and other attractions within the dam are known as the Enchanted Forest. A third dam, built at a height of 65 metres and will be 490 metres long at its crest, will overhang the valley below and incorporate a hotel. The project is set for completion by 2026.