📋 Tender Overview
ScopeThis application proposes to construct the last portion of Crosstrail Boulevard a 12 mile segment between Sycolin Road and the Dulles Greenway. The conceptual plan design proposes to provide an S-curve connection between the Dulles Greenway interchange and Sycolin Road. The project is assumed to have a major bridge crossing of Sycolin Creek as it travels east from the Dulles Greenway to land beyond the existing floodplain between Sycolin Road and the Dulles Greenway including connection to the Dulles Greenway at the existing Shreve Mill Road Interchange. The total length of this portion of Crosstrail Boulevard is approximately 2600 linear feet. This is a new roadway on a new alignment. A portion of Crosstrail Boulevard from Sycolin Road to Claudia Drive was opened to traffic in June of 2019. When Segment B Russell Branch Parkway starts construction later this year and completed there will be a continuous 4-lane roadway connection from the Dulles Greenway to Route 7.