📋 Tender Overview
Project Description: The sanitary sewer portion of this project consists of removing the existing combined sewer and installing approximately 385 metres of sanitary sewer, and 27 lateral service connections. The storm sewer portion of this project consists of installing approximately 645 metres of storm sewer pipe, and 27 lateral service connections. It will also include establishing a dedicated storm sewer outlet to McGregor Creek. The watermain portion of this project entails replacing the existing water main with approximately 590 metres of watermain. It will also involve replacing a total of 35 water services and 3 fire hydrants. The concrete sidewalk, concrete curb and paved roadway will be replaced as part of the reconstruction. Design to commence in 2025, with construction in 2026.