Scope : To Build Coal-Fired Thermal Power Plant in Semey, Kazakhstan
Russia will build coal-fired thermal power plant in Kazakhstan on a turnkey basis.
The corresponding memorandum was signed between the Ministries of Energy of Kazakhstan and Russia.
Thermal power plant will be built in Semey.
The Deputy PM pointed out that a feasibility study will be developed for the construction of thermal power plant in Semey.
The energy ministers of Kazakhstan and Russia Almassadam Satkaliyev and Nikolay Shulginov signed a memorandum of cooperation on project for the construction of thermal power plant in Kazakhstan.
By 2027 it is also planned to build a thermal power plant in Semey with a capacity of 360 MW.
Partner :
Ministry of Energy of the Russian Federation
Address : Russian Federation
Website : http://minenergo.gov.ru/en
π Key Information
π
Tender Reference No.
496949989
π
Publication Date
13 Nov 2023
π°
Estimated Value
N/A
π
Sector
Non-Renewable Energy
π
Deadline
31 Dec 2027
π
Notice Type
Projects
π
Location
Kazakhstan
π
Contract Duration
4 Years 1 Month 18 Days
π
Documents & Downloads
No documents found
π·οΈ CPV
No CPV found
Need help with this bid?