📋 Tender Overview
Scope of WorkCleveland Hopkins Airport Expansion.DescriptionA US2 billion master expansion plan has been unveiled for the Cleveland Hopkins Airport that includes new concourses a redesigned traffic flow into the airport campus and a bigger terminal. The plans have been presented to the City Councils Transportation Committee. The concourse reconstruction involves the building of concourse B C and D as well as the remodeling of concourse A. It was also announced that there is a need for a new security and ticketing area as well as the requirement of onsite rental car facilities and closer parking. Redesigning of roads surrounding the airport and the construction of an elevated connecting road which will be linked to Interstate 71 to eliminate all airport traffic from State Route 237 have also been included in the proposal.Plan is bold and its big the airports terminal is among the needed changes as it currently has a pre-911 design. Roadways parking and rental car areas also need improvement. they dont need to add any more runways they do need to do a lot of work over the next 10 years on that airfield but will not need to expand beyond current boundaries of the airport. Under the citys preferred scenario the Cleveland Hopkins Airport expansion would include a renovation of Concourse A and rebuild Concourses B and C. The Concourse D which has been sitting empty since 2014 when United pulled its hub out of Cleveland would be demolished in favor of two new concourses branching off the main terminal area but officials decided building a new Concourse D and a small Concourse E would make for better use of land and shorter walking times for passengers. Construction on the first phase of the plan which would cost an estimated 780 million wouldnt begin until 2026.Included in the first phaseRenovation of concourses A and C and replacement of concourse B.Addition of a new five-gate concourse E which would extend south from the main terminal. This new concourse would allow for the construction of new B.Demolition of concourse D built in 1999 for Continental Airlines.Expansion and renovation of the terminal including increased space for ticketing and check-in consolidated Transportation Security Administration screening and relocated customs to the front of the airport.Relocation of the rental car facility back to the main airport campus from its current location about 2 miles north of the terminal demolition of the Sheraton Airport Hotel more parking and a new cell phone lot.