📋 Tender Overview
Scope of WorkChambers Creek Regional Wastewater Treatment Plant Tunnel Expansion Phase 1.DescriptionLocated in the Lakewood East Basin this project will replace or parallel the existing Chambers Creek Tunnel 54-inch line to provide adequate capacity for build out and will consist of an expansion of 2532 linear feet of existing 54 pipeline with 72-inch pipeline or the equivalent parallel system to give the combined system the same hydraulic capacity as a 72-inch interceptor. The new line will serve the entire ChambersClover Creek sewer service basin minus the City of University Place and the City of Tacomas Western Slope area. The alignment will generally run from the beginning point of the Chambers Creek Tunnel at Bridgeport Way West and Meadow Park Road West in a southeasterly direction within Bridgeport Way West to the end of the Bypass Interceptor at Bridgeport Way West and 75th Street West.