π Tender Overview
Scope :
Central Hub V Substation is a 500/330kV substation located at Central Hub, New South Wales, Australia. The substation is proposed and is expected to be commissioned in 2029. The Central Hub V Substation will be operated by TransGrid.
The designed voltage level of the substation is 500/330kV and the operating voltage level is 500/330kV. The step in voltage of the project is 500kV and the step out voltage is 330kV.
Central Hub V Substation is owned by TransGrid