📋 Tender Overview
Project : ENG-012-20
Project Description : East Riverside Flood Protection Dikes were constructed along Riverside Drive from St. Rose Beach to the City boundary with the Town of Tecumseh in the 1980’s. The dike system was intended to provide vital flood protection for areas potentially affected inland as far as the Via Rail corridor. The issue of flooding has increasingly become a major concern with the recent return of record high water levels on Lake St Clair. Through an FCM MCIP grant, an inventory of the existing 6km dike system and review of the existing storm sewer system identified deficiencies where the system is vulnerable to overtopping and bypassing. The East Riverside Flood Risk Assessment was completed in 2019. The infrastructure requires improvements in order to address the vulnerabilities to mitigate the risk of overland flooding.